banner
Home » Products »

CNC ABS Plastic Cover Rapid Plastic Prototyping

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-04 04:33

  • Browse the number:

    301

Send an inquiries
Company Profile
Smart Mold Technology Limited
By certification [File Integrity]
Contact:

fengqiang(Mr.)  

Email:

Telephone:

Phone:

Area:

Guangdong

Address:

Room 1411, The Oriental Plaza, Jianshe Road 1072,Shenzhen City, China Mainland

Website: http://www.hankingplastic.com/ http://fengqiang.vintagechinahirehertford.com/
Product details


Product Description

(1).Material:Plastic/Metal

(2).Surface Finished:Anodize&Sandblasting

(3).Process: CNC Milling

(4).Tolerance:0.02mm

 

2. Parts Information:

(1). Applicable Material---Aluminum/zinc alloy, iron, steel alloy, plastic, brass, steel, and stainless steel

(2). Surface treatment---polishing, zinc plating, nickel plating, chrome plating, anodizing.

(3). Payment Terms: 40% deposit before production and 60% balance before arrange shipping                 

(4). Packaging: Standard package/ Pallet or container/ as per customized specifications.

(5). Shipment Terms: Express & air freight is preferred / sea freight/ as per customized specifications.

 3.Advance:

                                                          Our Advance

(1).Direct from factory

(2).Low(1-2%)scrap rate

(3).All kinds of metal&plastic material is available

(4). High Tolerance: +/- 0.02mm(Metal shaft), +/-0.03mm(plastic)

(5). 100% inspection(offer QC report)

(6). Sample is available

(7). Short lead time (5-20 days).

(8). One-stop customized service


CNC machining

 

 

 

Machining Metal parts:

Machining plastic parts:

Equipments:

 

 

Packaging:   1  White paper

                      2   Plastic foam or bubble carton

                      3   Clear protection films

                      4   Plastic foam or bubble carton

                      5   Carton case or wooden case or as per consumer's 

 Shipping:   1.Main port:

                              Shenzhen/Guangzhou/Hongkong or as require.

                              2.Leading time:

                               Normally goods can be ready within 5~7 days.

                       3.Express Company: