banner

Boiler Soot-Blowing in Power Plants

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2019-05-23 20:28

  • Browse the number:

    105

Send an inquiries
Company Profile
Zhejiang Lemond Power Equipment Co.,Ltd
By certification [File Integrity]
Contact:

laimengde(Mr.)  

Email:

Telephone:

Phone:

Area:

Zhejiang

Address:

No.89 Xueyuan Road, Jiangzao Town, Zhuji City, Zhejiang China

Website: http://www.soot-blower.com/ http://laimengde.vintagechinahirehertford.com/
Product details

LMD-V04 Furnace Soot blower parameters:

Product name

LMD-V04 furnace sootblower

Soot blowing medium

Steam

Maximum gas temperature

500℃

Application field

Furnace water wall

Travel distance

255mm

Steam consumption

60-110kg/min

Blowing time

11-60s

Blowing angle

30-360°

Effective blowing radius

3.5m

Recommended blowing pressure

0.8-1.5Mpa

Total weight

140kg/165kg

Valve body material

Cr - Mo steel

Nozzle material

Heat-resisting stainless steel

Companion flange

DN80 PN63 DIN2546 Standard


LMD-V04 sootblower is used for power plant boiler ash blowing in the water wall field, which is the previous design of LMD-V92 sootblower,  with smaller volume. It’s very convenient for plant side to install and maintain, no need the special suspension, and occupy less space.

Short retractable sootblower are normally installed in the negative pressure area of the boiler, in this case there would be enough  air absorbed into the boiler, and make good sealing effect of the wall box and sootblower collector. If with positive pressure boiler, it need to equip the special positive pressure wall box, we can provide both of them to  meet your requirement.

Our furnace sootblower is designed for wall heating surface, the basic element is the nozzle head which contain two Venturi nozzles.  According to the ash of the combustion in the boiler, we will calculate and design the nozzle diameter and blowing pressure, in order to make the best of blowing efficiency.


Plant site installation:




http://www.soot-blower.com/

New Products